Trillion on Chalk

Project Overview

Project Name:

Trillion on Chalk

Category:

Residential Architecture

Durations:

18 Months

Date:

2019

Location:

Lutwyche

Trillion on Chalk unveils a stunning brand-new apartment building comprising 43 units, ideally located just a minute's walk from Lutwyche bus station. Its strategic proximity to the Clem 7 and airport link tunnels ensures swift access for convenient travel.

Key features

Each feature of this project is planned to make your work easier, faster, and more organized. From wide roads to strong infrastructure, everything is built to support day-to-day industrial activities comfortably.

43 Apartment Units

Brand-new apartment building with 43 units.

43 Apartment Units

Convenient Location

Minute's walk from Lutwyche bus station.

Convenient Location

Proximity to Tunnels

Close to Clem 7 and airport link for easy travel.

Proximity to Tunnels

Project development process

We follow a step-by-step approach to make your project easy and stress-free. First, we learn what your business needs. Then we help you choose the right space, plan the layout.

Requirement Understanding

Interiors and production layouts are planned based on machinery and process needs.

01

Installation & Setup Support

Interiors and production layouts are planned based on machinery and process needs.

02

Operational Hand-Off

Interiors and production layouts are planned based on machinery and process needs.

03

Project solutions & problem

Every industrial project comes with its own set of challenges, from infrastructure limitations to workflow inefficiencies metro Industrial Hub is designed to overcome these issues through thoughtful planning, reliable systems, and strategic layout design.

Project Problem:

Unorganized Layouts:

Poor space planning slows production & creates bottlenecks.

Weak Infrastructure:

Poor space planning slows production & creates bottlenecks.

High Operational Costs:

Poor space planning slows production & creates bottlenecks.

Project Solutions:

Reliable Utility Infrastructure:

Poor space planning slows production & creates bottlenecks.

Flexible Unit & Plot Configurations:

Poor space planning slows production & creates bottlenecks.

Optimized Operational Design:

Poor space planning slows production & creates bottlenecks.