Main Avenue

Project Overview

Project Name:

Main Avenue

Category:

Residential Architecture

Durations:

15 Months

Date:

2023

Location:

Brisbane

Main Avenue boasts a five-storey boutique design, showcasing six luxurious penthouses with unparalleled 360-degree panoramic views. Set to redefine opulent living, these residences offer a harmonious blend of sophistication and comfort.

Key features

Each feature of this project is planned to make your work easier, faster, and more organized. From wide roads to strong infrastructure, everything is built to support day-to-day industrial activities comfortably.

Five-Storey Boutique Design

Elegant five-storey structure.

Five-Storey Boutique Design

Luxurious Penthouses

Six luxurious penthouses with 360-degree views.

Luxurious Penthouses

Opulent Living Spaces

Harmonious blend of sophistication and comfort.

Opulent Living Spaces

Project development process

We follow a step-by-step approach to make your project easy and stress-free. First, we learn what your business needs. Then we help you choose the right space, plan the layout.

Requirement Understanding

Interiors and production layouts are planned based on machinery and process needs.

01

Installation & Setup Support

Interiors and production layouts are planned based on machinery and process needs.

02

Operational Hand-Off

Interiors and production layouts are planned based on machinery and process needs.

03

Project solutions & problem

Every industrial project comes with its own set of challenges, from infrastructure limitations to workflow inefficiencies metro Industrial Hub is designed to overcome these issues through thoughtful planning, reliable systems, and strategic layout design.

Project Problem:

Unorganized Layouts:

Poor space planning slows production & creates bottlenecks.

Weak Infrastructure:

Poor space planning slows production & creates bottlenecks.

High Operational Costs:

Poor space planning slows production & creates bottlenecks.

Project Solutions:

Reliable Utility Infrastructure:

Poor space planning slows production & creates bottlenecks.

Flexible Unit & Plot Configurations:

Poor space planning slows production & creates bottlenecks.

Optimized Operational Design:

Poor space planning slows production & creates bottlenecks.